EUROPA DE EST: INVESTITII PRIORITARE DE URGENTA IN INFRASTRUCTURA DE PETROL SI GAS
Exportare în PDF Exportare în Word
Informații de finanțare  (Euro)
Total angajamente curente:
957 008 Euro
Total angajamente planificate:
0 Euro
Total debursări curente:
957 008 Euro
Total debursări planificate:
0 Euro
Total cheltuieli:
0 Euro
Debursări nealocate:
0 Euro
Total cheltuieli planificate:
0 Euro
Durata proiectului:
23  Luni
Rata de livrare:
100%
Rata de consumare:
Informații adiționale
Proiect creat de:
IDEA Importer
Creat în spațiul de lucru:
IDEA Import - Team
Calculat:
Nu
Proiect creat la data de:
01/05/2013

Coordonatorul echipei de introducere date:
Administrator Administrator Administrator@gov.md
 
Identificare
Titlul proiectului: 
EUROPA DE EST: INVESTITII PRIORITARE DE URGENTA IN INFRASTRUCTURA DE PETROL SI GAS
ID PGA: 
idea_1396

Stadiu:  Finalizat
Motivul statutului: 
Obiective: 
28/11/2001 by Jean : áPromoting the regional integration of the oil and gas pipeline systemsáFacilitating oil and gas transport both within the region and towards the export markets of Europe.
Descriere: 
áPromoting the regional integration of the oil and gas pipeline systemsáFacilitating oil and gas transport both within the region and towards the export markets of Europe.
Componente de Acţiuni:  29/11/2001 by Stela : 1. Identify and rank potential projects2. Perform design for the selected projects3. Procurement of hardware4. Management and supervision of the local contractors5. Commissioning of new equipment6. Training of local staff.
Memo:  29/11/2001 by Stela : Since the project is financed only by the end of 2001 and it is clear that Causeni GSM will need more time, there was a request to continue the project for Moldova in 2002. There was no official answer yet, however preliminary Tacis agreed to provide the requested extension. The final decision is to be taken by the middle of November.29/11/2001 by Stela : Causeni metering station has suffered seroius delays (now only 25-30 % of works is finished, although ny now all works should have been finished), according to the schedule and is well behind the schedule and an extension into 2002 has been applied for.Delays is due to the fact that Moldovan side (Moldovagaz) did not provided finances foreseen.Final decision on extension is due by mid November 2001.29/11/2001 by Stela : The construction of the main building was finalised. Also a five-km road was done. At present the construction of the outbuildings are going on. As a whole MoldovaGaz has invested up to 200 th. USD into the construction and about 350 th. USD into the equipment. However, that is only a small part of what must be invested. Thus, the linear part of the equipment (pipes) has not been purchased yet. MoldovaGaz needs about 750 th. USD to buy this equipment, but this large sum is not available at the moment. The delays in equipment purchase from the Moldovan side caused the delays of the delivery and installation of the equipment from the EU side. Nevertheless, part of the mechanical equipment was delivered by the Contractor in August-September 2001, but that equipment is stored in Chisinau. The rest of the equipment (metering equipment) was ordered and prepared for Causeni GMS, but was not delivered due to delays in finalisation of the station. The Contractor regularly (on a monthly basis) visits the Causeni GMS to monitor the progress. As soon as the local contribution is completed, the Contractor will deliver and install all foreseen equipment. New management of MoldovaGaz was appointed at the end of October.
Scop:
28/11/2001 by Jean : 1. Identification and selection of priority investments that meet predefined technical, operational and economical criteria2. Setting up the technical and other conditions for those investments to be implemented efficiently on a pilot basis with the support of Tacis financing and the preparation of local counterparts, firms and experts3. Monitoring the installation of the pilot investments optimising all components, which will enhance the standardisation of selected investments in terms of operational, environmental, maintainability, safety and health conditions4. Training local firms in project identification, preparation, evaluation, supervision and more generally implementation techniques including the possibility of local assembly and manufacturing of project components and the establishing of joint ventures.
Rezultate: 
28/11/2001 by Jean : 1. List with proposed projects 2. Criteria and recommendations for project selection3. Engineering study reports and project design reports for the selected projects: gas metering stations Grebenyky (Ukraine), Kaushany (Moldova) and Kobryn (Belarus)4. Procurement packages for gas metering facilities at Grebenyky and Kaushany5. Project 'Appraisal' Reports 6. Implementation plans to define the respective responsibilities and commitments of all Parties for the implementation of the selected projects7. Progress reports on engineering, procurement and construction8. Training Workshops on project execution and gas metering9. Project completion report(s).

Buget
Budget Unallocated


Identificatori proiect: 
Planificare

Data propusă de începere: 
Data efectivă de începere:  07/05/1999
Data originală de terminare: 
Data efectivă de terminare:  05/05/2001
Durata proiectului:  23 Luni
Localizare
[Belarus]

[Moldova] 100%

[Ukraine]

Nivel de implementare: Internațional

Localizarea implementării: Țară

Sectoare
Sectoare DAC / OECD
DAC 5 Sector Code - 400 - MULTISECTOARE - 430 – ALTE MULTISECTOARE (100.0)%

Costul propus al proiectului
Cost 957 008   Euro
Data Semnătura 07/05/1999
Finanțare
Numele Organizației : Uniunea Europeană
Organization Role : Finanțator
Tipul de asistență : Asistenţă tehnică
Financial Instrument : Grant
Angajamente curente Rată de schimb
Curentă 07/05/1999 957 008   Euro 0.943
SUBTOTAL ANGAJAMENTE CURENTE: 957 008 Euro    
Debursări curente: Rată de schimb
Curentă 07/05/1999 957 008   Euro 0.943
Subtotal Debursare Curentă: 957 008 Euro    


 
TOTAL ANGAJAMENTE CURENTE: 957 008 Euro  
Total debursări curente: 957 008 Euro  
Rata de livrare: 100%
Documente asociate
Organizații implicate
Organizație contractantă / implementatoare
  • Compania Tebodin Consultants & Engineers 100.0 %